مانع التسرب الإيبوكسي من كايبييل - هذا المنتج يتميز بخصائص بناء ممتازة مثل مادة مالئة الأسمنت، وكذلك خصائص كيميائية ممتازة لمانع التسرب الإيبوكسي. بمجرد استخدامه، تكون
Caibel epoxy sealant for water environmental protection formula. there are 2 components (import):A group is epoxy resin and filler mixed slurry, The B group is an epoxy curing agent. With waterproof, mildew, anti alkali, anti leakaghighstrength, abrasion resistance, stain resistance, acid anda alkali resistance corrosion resistance, strong adhesion.
Technical data:
Technical data: A mixture of storage tank time: 45 minutes. Open time(adhesive):30 minutes. Adjust the time (adhesive):60 minutes. For light load walking time: about 24 hours. For the use of time: 7 days after the resistance to chemical erosion.
Application range:
Indoor and outdoor decoration beautiful tile and stone filling. Also suitable for construction with various acid base tiles. Need to have a large area of high mechanical strength and acid resistance of industrial plant ground filling (suchas galvanized factory, leather factory, storage room, paper mill, etc.). The food industry (such as dairy products, cheese factory slaughterhouse, brewery. Wine brewery, refrigeration factory), store and highly clean construction requirements of the place (ice cream, food factory) filling. The swimming pool(including hot tub). Suitable for 1.5-8mm crevice.
Preparation before use:
Preparation before use: Ceramic tile glue or cement to dry solid, the gap in the overflow of ceramic tile glue or cement clean. Construction tool: rubber scraper.
Surface finishing cleaning tool: sponge. The construction of the temperature should be controlled at 8 DEG C, epoxy sealant before construction, if the tile substrate is too loose a larger gap, please test whethercan be cleaned. 1 The use of smooth hard rubber or silica gel plate will paste atI a 45 degree angle extrusion in dry crevice, small area should be carried out step by step. pay attention to the full.2 Then use a hard rubber or silica gel plate will be residual in the ceramic tile on the slurry as far as possible.3 Affer filling is completed clean in 20 minutes, clean with a damp sponge.(Note: sponge can be wet, To wring the water as much as possible, do not cut too much water).
The construction method of epoxy sealant:
1 This product is the design of the ratio of the product, each component mustbe in accordance with the proportion of the ratio, mixing and stirring do not add water.
2 In accordance with the brick gap size and brick body surface is smooth, grout filling construction is divided into three kinds, pointing and plastering construction.
The brick body loose capillary too much, in order to avoid the brick surface residual sealant, the way of construction. The brick pointing gap small smooth surface, need the cast construction joints. The barrel A component and B components to hand tools or low-speed mechanical mixer, mixing 1-2 minutes to mix evenly. Mixing the slurry should be used immediately, mixed slurry at 25 ℃ within the place time is about 30-45minutes, the higher the construction temperature, the shorter the placement time.
Therefore, after mixing in the AB should be used in the prescribed time. The temperature 25 ℃ and air humidity below 50% of the case about 24 hours can be normal walking, about 7 days after the stain and can have chemical resistance. You can clean up daily maintenance.The lower the temperature, the longer the drying time. According to the construction method tile size and seam width, depth, there will be differences, the following table dosage is for reference only, there will be about 15% difference.(Side length + side length) ÷ (side length × side length) × seam width mm × depth mm × 1.7= usage /per square (g).
International standards of products: Storage period:
24 months Executive standard: China JC / 2006RG - T1004: European RG EN13888; British 1980 - fifth of the 5980 categories from the8class: Germany DIN18156-E; United States ANSIA118.3 - 1992; First types of 71 GP30M in Canada.